GPC III
Waste
Solid waste and wastewater generated in the boundary, wherever it is treated.
What you’ll need for this sector (4/5 gathered)
Solid waste landfilled (in and out of boundary) · tonnes / year
Solid-waste hauler or contract manager
Organics composted & waste incinerated (in and out of boundary) · tonnes / year
Solid-waste hauler / facility operator
Wastewater treatment (population served) · people served
Wastewater / sewer district
Solid waste incinerated outside the boundary · tonnes / year
Ask: solid-waste hauler or county solid-waste department
Other jurisdictions' waste treated inside the boundary (territorial) · tonnes or people served / year
Ask: facility operators (public works or the private operator)
III.1.1Scope 1
Solid waste landfilled in boundary
III.1.2Scope 3
Solid waste landfilled outside boundary
37,597 t CO₂e
III.2.1Scope 1
Organics composted in boundary
III.2.2Scope 3
Organics composted outside boundary
536 t CO₂e
III.3.1Scope 1
Waste incinerated in boundary
III.3.2Scope 3
Waste incinerated outside boundary
III.4.1Scope 1
Wastewater treated in boundary
III.4.2Scope 3
Wastewater treated outside boundary
574 t CO₂e
III.1.3Scope 1
Imported waste landfilled in boundary
Needs a value or a notation key — GPC doesn’t allow an included source with no figure.
0 t CO₂e
III.2.3Scope 1
Imported organics treated in boundary
Needs a value or a notation key — GPC doesn’t allow an included source with no figure.
0 t CO₂e
III.3.3Scope 1
Imported waste incinerated in boundary
Needs a value or a notation key — GPC doesn’t allow an included source with no figure.
0 t CO₂e
III.4.3Scope 1
Imported wastewater treated in boundary
Needs a value or a notation key — GPC doesn’t allow an included source with no figure.
0 t CO₂e