TurboCAP
Read-only demoStart yours

City of Maplewood

FY 2024 GHG Inventory · FY 2024 · pop. 16,500

GPC III

Waste

Solid waste and wastewater generated in the boundary, wherever it is treated.

What you’ll need for this sector (4/5 gathered)
  • Solid waste landfilled (in and out of boundary) · tonnes / year

    Solid-waste hauler or contract manager

  • Organics composted & waste incinerated (in and out of boundary) · tonnes / year

    Solid-waste hauler / facility operator

  • Wastewater treatment (population served) · people served

    Wastewater / sewer district

  • Solid waste incinerated outside the boundary · tonnes / year

    Ask: solid-waste hauler or county solid-waste department

  • Other jurisdictions' waste treated inside the boundary (territorial) · tonnes or people served / year

    Ask: facility operators (public works or the private operator)

III.1.1Scope 1

Solid waste landfilled in boundary

III.1.2Scope 3

Solid waste landfilled outside boundary

37,597 t CO₂e

III.2.1Scope 1

Organics composted in boundary

III.2.2Scope 3

Organics composted outside boundary

536 t CO₂e

III.3.1Scope 1

Waste incinerated in boundary

III.3.2Scope 3

Waste incinerated outside boundary

III.4.1Scope 1

Wastewater treated in boundary

III.4.2Scope 3

Wastewater treated outside boundary

574 t CO₂e

III.1.3Scope 1

Imported waste landfilled in boundary

Needs a value or a notation key — GPC doesn’t allow an included source with no figure.

0 t CO₂e

III.2.3Scope 1

Imported organics treated in boundary

Needs a value or a notation key — GPC doesn’t allow an included source with no figure.

0 t CO₂e

III.3.3Scope 1

Imported waste incinerated in boundary

Needs a value or a notation key — GPC doesn’t allow an included source with no figure.

0 t CO₂e

III.4.3Scope 1

Imported wastewater treated in boundary

Needs a value or a notation key — GPC doesn’t allow an included source with no figure.

0 t CO₂e